Botanic Grove Reserve Revised Concept Design

Share Botanic Grove Reserve Revised Concept Design on Facebook Share Botanic Grove Reserve Revised Concept Design on Twitter Share Botanic Grove Reserve Revised Concept Design on Linkedin Email Botanic Grove Reserve Revised Concept Design link

Consultation has concluded

Feedback for this consultation has now closed.

The Botanic Grove Reserve Masterplan involved community engagement in two stages. Stage 1 occurred in 2019 and feedback received included:

Feedback received and considered in 2019 from local residents, school students, users of The ARC and other stakeholders included:

  • ensuring no further loss of mature trees
  • car parking and traffic management concerns
  • potential noise impacts
  • aesthetics and environmental concerns

On 17 March 2020, Council received the Community Engagement Outcomes Report from Stage 1 and resolved to:

Endorse Option 2 as its preferred option for the development at Botanic Grove Reserve and request that Staff investigate the following changes:

  • Scaling back the development to a more modest size that is likely to be supported by the Community and doesn’t require removal of any Reserve trees or green space
  • Inclusion of a toilet facility specifically for Reserve users
  • Improving pedestrian access (including better access from the eastern side of The ARC) and safety features for children and people of all abilities using the playground
  • Select most popular play and fitness space facilities, which align to Community feedback whilst still maintaining The ARC fitness requirements
  • Reassessment of car parking to minimise tree and green space removal (no option was clearly supported by the Community).
  • Council has revised the initial concept design and is now seeking community feedback on the draft design and changes implemented

To read the Council report and Community Engagement Outcomes Report, please access the Council Agenda - 17 March 2020 and scroll to Item 11.1 (page 37)

Feedback received during the Stage 2 Consultation process (details below of Stage 2 Consultation) was presented to Council on 15 December 2020. After considered discussion, Council decided to adjourn a decision on this matter for a period of 12 months.

On 21 December 2021, Council reconsidered the Botanic Grove Reserve Revised Concept Design and resolved to not proceed with a reserve upgrade at this time. 

Feedback for this consultation has now closed.

The Botanic Grove Reserve Masterplan involved community engagement in two stages. Stage 1 occurred in 2019 and feedback received included:

Feedback received and considered in 2019 from local residents, school students, users of The ARC and other stakeholders included:

  • ensuring no further loss of mature trees
  • car parking and traffic management concerns
  • potential noise impacts
  • aesthetics and environmental concerns

On 17 March 2020, Council received the Community Engagement Outcomes Report from Stage 1 and resolved to:

Endorse Option 2 as its preferred option for the development at Botanic Grove Reserve and request that Staff investigate the following changes:

  • Scaling back the development to a more modest size that is likely to be supported by the Community and doesn’t require removal of any Reserve trees or green space
  • Inclusion of a toilet facility specifically for Reserve users
  • Improving pedestrian access (including better access from the eastern side of The ARC) and safety features for children and people of all abilities using the playground
  • Select most popular play and fitness space facilities, which align to Community feedback whilst still maintaining The ARC fitness requirements
  • Reassessment of car parking to minimise tree and green space removal (no option was clearly supported by the Community).
  • Council has revised the initial concept design and is now seeking community feedback on the draft design and changes implemented

To read the Council report and Community Engagement Outcomes Report, please access the Council Agenda - 17 March 2020 and scroll to Item 11.1 (page 37)

Feedback received during the Stage 2 Consultation process (details below of Stage 2 Consultation) was presented to Council on 15 December 2020. After considered discussion, Council decided to adjourn a decision on this matter for a period of 12 months.

On 21 December 2021, Council reconsidered the Botanic Grove Reserve Revised Concept Design and resolved to not proceed with a reserve upgrade at this time.